Problem

Barry_img

Endotec have worked for Centrica Energy at their South Humber Bank Power Station since 2001. In 2006 we were contacted by the engineers at their Barry Power station near Cardiff to overhaul their valves. No problem – except the timescale. They needed it completing in less than two weeks.

The Solution

With this tight timescale there was no time to collect the valves, bring back to our workshop in North Lincolnshire, overhaul, certify and refit. Not wanting to let our customer down, our solution was to purchase a container which we used as a mobile support unit. The unit was fitted out with benches, compressor and lapping machines. Using this solution we were able to overhaul and fit back in service sixty Relief Valves in just 10 days.

Just another example of how determined Endotec are to ‘go the extra mile’ for their customers.